Green Line Metro

Equipment/Machines used:
Wiresaws, floorsaws, coring machines, lifting gears, mobile Cranes, and back propping materials.

Scope of work:
JMCI provided penetration opening in the walls, slabs, and beams to facilitate the installation of various services such as chilled water lines, AC ducts, ventilation pipes, electrical services.

How the work was executed:
Existing walls/slabs were modified using cutting equipment to allow for the new construction/design changes.

The work involved back propping/providing temporary support to the walls/slabs, marking out the outline of the MEP service that needed to pass through, providing lifting points, lifting plans, and lifting the sections using a combination of tower/mobile cranes.